Top of the Hill Wastewater System Improvements
Concord, NH
- This project entailed construction of a new waste water pumping station for the entire facility which houses 25+ mobile homes. The electrical scope PES was contracted to perform included;
- New 100A 120/208 3Ø Service
- Install all conduit, wiring, and fixtures for site lighting
- Install all conduit and wiring for new customer furnished 30kW automatic generator
- Install all conduit and wiring for new customer furnished pump control package
- Install all conduit and wiring for the new wet well, and valve vault
- Assisted Accura Construction with inspections and bringing the station online
Cocheco Pump Station, Dover, NH
- PES was contracted by Apex Construction to perform the electrical portion of the Cocheco Pump Station project in Dover NH. The project entailed demolishing the existing 450 GPM pump station in order to construct the new modern pump station within the same foot print. In order to maintain flow throughout the construction process PES installed all wiring and equipment for a bypass system including a temporary electrical service, a variable frequency driven bypass pump operated automatically via an ultrasonic level transducer, and an alarm dialer to notify the town in case of any pertinent alarms. Once the existing station was demolished, PES performed the entire electrical scope for the new station including;
- New 200A 120/208V 3Ø Service
- Interior & exterior lighting
- Interior general power
- SCADA communication system
- New interior 40kw automatic generator & ATS
- Design, furnish, & install new HVAC/Generator interlock controller
- Gas detection system
- Furnished and installed all control wiring throughout station and assisted the town’s integrator with bringing the station online.
- New Class 1 Division 1 wiring associated with the wet well
Pressure Reducing Valve Vault Replacement
Franklin, NH
- Perform Division 16 electrical scope associated with a new underground water pressure reducing vault. Electrical work included;
- New 100A, 120/240V 1Ø Service
- New Interior Lighting
- Wiring for interior heater, exhaust fan, sump pumps, pressure indicators, and SCADA integration
Turner Trucking; Lynn, MA
- Industrial Shredder Motor Wiring Repairs
- Disassemble the shredder motor terminations and remove the conductors
- Remove & replace the associated conduit systems & junction box
- Install new stator and rotor conductors
- Energize the shredder motor and check for correct rotation
New Balance Athletic Shoe; Lawrence, MA
- Factory Mill Exterior Lighting Renovations – LED Upgrades
- Remove & Replace 16 Existing Exterior Wall Mount Light Fixtures
- New 277V Exterior Lighting Branch Circuitry & Controls
- 23 New LED Exterior Wall Mount Exterior Light Fixtures
- Distribution Center Exterior Lighting Renovations – LED Upgrades
- Remove & Replace 60 Existing Exterior Wall Mount Light Fixtures
- Parking Lot Lighting – LED Retrofit of 15 Existing Pole Light Fixtures
- Factory Mill – 277/480V & 120/208V Emergency Power Distribution Expansion
- 225A 3Ø 480V Feeder & Panelboard
- 30kva 277/280V – 120/208V Transformer
- 100A 3Ø 120/208V Feeder & Load Center
- Loss Prevention Office Renovations – Emergency 120/208V Branch Circuitry
- Factory Mill – 5th Floor Office Space Renovations
- Relocation of 120V Branch Circuitry for 100+ Cubicle Locations
- Relocation of Telecommunication Sleeves for 100+ Cubicle Locations
Phase II Medical Manufacturing; Rochester, NH
- 3000 sf Design Build Clean Room Expansion
- HO Fluorescent Lighting
- 120/208V Equipment Branch Circuitry & Connection
- 24V Fire Alarm System Wiring & Connection
- 120/208V HVAC Branch Circuitry & Connection
Turbocam International
- Barrington, NH – Cafeteria Lighting Renovations
- LED Retrofit of 14 Existing Fixtures
- Dover, NH – Office Space Renovations
- 120/208V HVAC Equipment Branch Circuitry
- Installation of New Daikin Multi-Zone Mini Split Systems
- Low Voltage HVAC Wiring
- Interior LED Lighting Upgrade
Craft Beer Distributors of NH; Portsmouth, NH
- Wiring of a 4500 sf Walk-In Cooler
- Vapor proof LED Lighting
- HVAC Equipment Branch Circuitry & Connection
- 208V Fork Lift Battery Charging Station
Georgia Pacific; Newington, NH
- LED Lighting Upgrade
Architectural Openings; Somerville, MA
- New 600A 277/480V 3Ø 4W electrical service
- Industrial renovations/remodel